SERVICES

  • Main Line Construction - From 2" to 36" Pipe
  • Compressor Station Construction
  • Pumping Station Construction
  • Well Site Tanks and Piping
  • Gas Distribution
  • Hydrostatic Testing
  • Pipeline Maintenance
  • Emergency Response
  • Right-of-Way Clearing
  • Cathodic and Pipe Coating Repair and Recoat
  • Concrete Construction
  • Pipe Fabrication
  • Pipe Line Integrity-Dig Ups and Sleeving
  • Horizontal Directional Drilling
  • Seeding and Mulching
  • Crane Service
  • Vacuum Excavation
  • Gathering and Trunk Lines
  • Metering Stations
  • Regulator Stations
CONTACT US TODAY
(231)-258-4181

JOB START AND JOB COMPLETION

Quality|Integrity|Safety

JOB #1

PJ Steel Pipeline Construction
305 E. Park Drive
Kalkaska, MI  49646
Office: (231)258-4181
Fax: (231)258-4170
MEA - Veriforce
NCCER
Copyright 2017